Document management

Constitution

  • Isometric plans control and modification if necessary
  • Certificates 3.1 material control
  • Welding notebook, welders’qualifications and NDT control
  • Writing to :
    • Welding logbook 
    • Calculation notes
    • Presentation files
  • Test files compilation

conformity control

  • Completeness of files verification
  • Control to :
    • isometric plans tels as constructed
    • Material certificates
    • Welding notebook
    • Welders’qualifications
    • Welding book as constructed
    • Bending files (operating modes, bending control sheet, tube certificates)
    • Delarding files (plans, calculation sheets, tubes certificates)
    • Calculation notes
    • Presentation work files 
  • Analysis reports writing

Authorized organism Presentation

  • Presentation files
  • Answer to questions
  • Updating files
  • Audit assistance Dréa

Constitution

  • Writing to  :
    • Presentation of the works and their scope
    • Contact list
    • Cover pages
    • Nomenclature of materials to be welded
    • Table characterizing the different types of welding joints
    • List of filler products used
  • Compilation and control to :
    • Descriptions of welding procedures implemented by joint ypes (DMOS)
    • Qualification Welding Operations covering DMOS (QMOS)
    • Welders’qualifications PV (Q.S) 

conformity control and validation

  • Control to :
    • Presentation of the works and their scope
    • Contact list
    • Cover pages
    • Nomenclature of materials to be welded
    • Table characterizing the different types of welding joints
    • List of products used
    • Descriptions of welding procedures implemented by type of joint (DMOS)
    • Qualification Welding Operations covering DMOS (QMOS)
    • Welders’qualifications PV (Q.S) 
  • Signature and stamp of validator to :
    • Cover pages
    • Presentation pages for the table of materials to be welded
    • Presentation pages for the summary table of joint types
    • Descriptions of Welding Procedure Specifications (DMOS)
  • Inclusion of the IWT or IWE diploma of the control manager.
  • Writing analysis reports.

On behalf of managers pressurized fluid transport, we carry out conformity files declaration before commissioning.

Carried out according to the types of structures and the regulations they are subject to, we provide :

  • Mails writing
  • Plans realization
  • Documentary research
  • Conformity control of the constituent elements
  • Transmission files

According to customers’requests.

According to customers’ requests and the regulations in force

According to customers’requests

According to customers’requests